Intris · Data Center UPS Battery Selector

One battery planner. Four clear paths.

Choose 1‑Phase or 3‑Phase UPS, then select SMF / VRLA or Lithium‑ion. Define the UPS duty, battery backup time, strings and battery capacity, then review the recommended configuration for your data-center application.

1Φ UPS3Φ UPSSMF / AGM VRLALIBStrings & AH sizingWhatsApp / Email enquiry
SMF + LIB Battery SystemsData-center UPS battery architectures
SMF VRLA UPS batteries installed on an industrial battery rack
SMF / VRLABatteries installed on an industrial battery rack
Lithium-ion UPS battery cabinet with rack-mounted modules
Lithium-ionModular LIB battery cabinet for UPS applications
Interactive sizing

Select your UPS and battery technology.

Each battery path is handled independently. Select the UPS phase and battery technology to display the relevant inputs, sizing logic and recommended configuration.

1. UPS Phase
2. Battery Technology
1‑Phase UPS · SMF / VRLA · High-rate battery sizing
1‑Phase SMF / VRLA
The 1‑Phase sizing engine uses a Quanta high-rate discharge reference. Final battery selection should always be validated against the exact battery model, UPS DC window, end-of-discharge voltage and project operating temperature.
Battery Sizing Result — 1 Phase
Power (KVA)kVA
Power (VA × Pf)kW
Load Pf (Pf)PF
DC-AC Efficiency%
End Cell VoltageV
12 V Battery Block / StringNos
Number of StringsString
DC Current / StringA
Required Watt / BatteryW/Battery
Offered Watt / BatteryW/Battery
Back-up TimeMins
Offered Battery AHQUANTA
Offered number of BatteriesNos
Battery VAHVAH
SMF / VRLA · India

Five OEM options, with Exide as the Intris first sales approach.

Compare five SMF / high-rate battery options for Indian data-center UPS projects. Intris can validate the selected brand, Ah, number of strings, battery quantity and project-specific discharge duty before finalization.

INTRIS FIRST SALES OPTIONExide PowerSafe EHP for Data Center UPS

Exide has a dedicated data-center vertical in India and a PowerSafe EHP range specifically developed for data-center applications. The company reports that its front-terminal and top-terminal data-center batteries have secured approvals with key consultants, co-location players and enterprise DC integrators, supported by Exide’s established Industrial UPS sales and service network across India.

Lithium‑ion · Data Center UPS

Samsung SDI & LG Energy Solution.

Two separate LIB reference architectures are built into the selector. The result is a planning recommendation—not a substitute for UPS/OEM compatibility approval, BMS integration and project certification.

Samsung SDI

High-power UPS battery references

The calculator can automatically choose among Samsung’s public UPS references based on requested backup time.

U8A1 · 263 kW/rack · 5 minUPS 6C · 34.6 kWhUPS 4C · 35.7 kWh
  • U8A1 is Samsung’s current high-power data-center UPS reference for five-minute backup.
  • The older official UPS 6C and 4C references provide 10-minute and 15-minute+ planning paths.
  • Final current product availability and UPS compatibility must be reconfirmed.
LG Energy Solution

JP5 dual-string UPS architecture

LG publicly describes JP5 as a compact AI-data-center UPS battery rack with two independent strings for flexible operation.

JP5 architecture2 independent strings/rackBMS-led system
  • The calculator uses a JP5 planning reference of 35.14 kWh / 174 kW per string and 70.28 kWh / 348 kW per dual-string rack at the 10-minute design point.
  • Those numeric planning values must be validated against the current LG technical submittal before quotation.
  • Final solution requires UPS interface, BMS, DC protection and rack-level integration review.
Planning note: SMF calculations and LIB results use battery performance data and OEM reference architecture values for preliminary planning. Final battery sizing must be validated against the exact UPS DC window, BMS/communication compatibility, end-of-discharge limits, temperature, ageing, redundancy and current OEM technical documentation.
Page top